Completely empty, Terracon and ACT on site since 4/27/18 they have drained and patched holes and completed on 5/14/18 The OWS was drained via pump truck on two occasions but we have not been provided the documentation as of yet. The pumps will be turned back on this date. 24 inches in tank currently.
Condition or appearance
Completely empty, Terracon and ACT on site since 4/27/18 they have drained and patched holes and completed on 5/14/18 The OWS was drained via pump truck on two occasions but we have not been provided the documentation as of yet. The pumps will be turned back on this date. 24 inches in tank currently.