Project is completed where we were replacing all sumps. High water table in this area called for need to pump dirty, silt laden water into ows nearly 24 hrs a day. Run off from rain also picked up dirt from back fill piles filling trench drains. This has resulted in spike of sludge depth and a need to clean ows, trench drains. With this in mind we want to go ahead and clean the trench drain and lift station in shop as well.