Pond is 40% full, pond still has 2' of Sludge at the bottom that needs to be cleaned. Pond is currently green in color, with lake odor. 7/12/23 AECOM on site took water samples from OWS and from the pond, took measurements of pond, and discharge Permit.
Other observations
Additional maintenance needed
Additional information
Currently have Arppox 18" of water inside French Drain since 1/25/23 previously reported.