Pond is 40% full, pond still has 2' of sludge at the bottom that needs to be cleaned. pond is currently Greenish Brown,with Lake Odor. 7/12/23 AECOM on site took water samples from OWS and from the pond, and took measurments of pond,. 11/02/23 Patrick with AECOM back on site taking soil samples of pond run off.. inside and outside of fencing.
Other observations
Additional maintenance needed
Additional information
Currently have Approx 16" of wateer inside French Drain sinse 1/25/23 perviously reported.